top of page

ADVANCED ARCHITECTURAL CONSTRUCTION

(ARC60104)

self reflection

My experience with this module allowed me to learn about the IBS system and other construction systems. Through Project 1, I was able to gain collaborative skills in a group environment which was vital as we had to work on a physical model that required poured cement as the material and a 60+ page report. Through Project 2, I showcased how I implemented the various construction systems into my final architecture studio project including the 2 facade systems.

bottom of page